Latest AGR Subsea news

AGR Drilling Services PTY LTD signs Gorgon Project Excavation Contract with Van Oord Australia PTY LTD
Monday, 21 June 2010
AGR Drilling Services PTY LTD signs Gorgon Project Excavation Contract with Van...
Read full article
AGR Subsea Ltd begin platform leg excavation work in Baltic Sea
Monday, 31 May 2010
AGR Subsea Ltd begin platform leg excavation work in Baltic Sea AGR's Excavation...
Read full article
AGR Subsea and Mako Technologies Sign Representation Agreement
Wednesday, 10 February 2010
AGR Subsea and Mako Technologies Sign Representation Agreement Bergen, 8th February 2010: AGR...
Read full article
AGR Subsea signs excavation master service agreement with Heerema Marine Contractors
Thursday, 25 June 2009
AGR Subsea signs excavation master service agreement with Heerema Marine Contractors AGR Subsea...
Read full article
AGR & StatoilHydro sign Seabed Excavation Frame Agreement
Monday, 01 December 2008
AGR & StatoilHydro sign Seabed Excavation frame agreement AGR Group announced recently that its...
Read full article
Cutting Edge Technology To Be Unveiled at Subsea Europe
Friday, 10 October 2008
Cutting edge technology unveiled at Subsea Europe '08 Cutting edge technology that has...
Read full article
Downloads

General Brochures

Please view our latest brochure.
SeaVator insert (394.58 kB)
AGR’s versatile and industry proven Mass Flow Excavator, capable of non-contact seabed intervention at depths up to 150m.
The water-powered SeaVator derivative, capable of deepwater excavation.
AGR’s new seabed intervention technology for route preparation, including deepwater trench construction in cemented soils & clays up to 400kPa shear strength.
Our datasheet describing AGR’s latest seabed intervention technology. ClayCutter X has been designed for route preparation including deepwater trench construction in cemented soils & clays up to 400kPa shear strength.
AGR has a fleet of three high pressure, high volume 3,000bhp diesel driven pumps.
AGR has a fleet of three high pressure, high volume 3,000bhp diesel driven pumps.
LARS datasheet (425.81 kB)
AGR’s dedicated (L.A.R.S.) launch and recovery system, designed to minimise deck footprint.